There's great progress!

The contractors have been busy. Check out the photos below!

July 25


The view from Aquetong Road

The sanctuary roof top in the background.
The walls are pretty high and still going!

The front sanctuary doorway, and three sets of busy
(very warm!) workers doing the same thing.

The somewhat agonizing truth of building a
strong structure: One block at a time!!!

July 17


Blocks going up for the addition

Blocks going up for the addition

Newly laid floor beams of Fellowship Hall

July 15


Great progress is being made on the new addition

July 13


Blocks going up for addition (taken from old
breezeway between CE building and Sanctuary)

New addition (taken from cemetery)

Floor joists going in for new transom in Fellowship Hall

July 2


AC/heating ducts for addition and renovation

Building materials (bricks/lumber) for new addition

Latest view of the new parking lot

June 19


Fellowship Hall

Work being done to complete the overflow parking area

New interior wider hallway

June 10


Temporary ramp over the kitchen addition into the
existing kitchen area

Fellowship Hall addition; notice the cinderblock is about
up to existing floor level

Very front part of Fellowship Hall, showing basement windows

May 30


Concrete being poured for the Music/Youth addition

Around the edges of the elevator shaft

Working quickly to spread, smooth and level the concrete

Working quickly to spread, smooth and level the concrete

At the office entrance, five rows of cinder blocks outline
the outer extension wall of Fellowship Hall, as well as the
outer extension wall of the kitchen. First man on the
right is actually "in" the new kitchen area, with the older
existing kitchen area (including the door to the hallway)
evident in the background

May 28


The construction crew starting to lay the foundation for the Music/Youth Addition

Elevator shaft

Footings for the addition off the breezeway area

Footings for the addition off the breezeway area

Footings indicating where the extension wing of Fellowship Hall
will be to the left, chapel side

Right side of Fellowship Hall showing the extension wing as
well as the enlarged kitchen area

May 10


Preparation outside Fellowship Hall, the kitchen
and office entrance earlier this past week.

Outside Sanctuary/music room

Pouring at Fellowship Hall/kitchen area on Thursday

May 3


Cinder blocks for Youth-Music addition

Digging the new kitchen foundation

Music-Youth addition

More...