There's great progress!
The contractors have been busy. Check out the photos below!
July 25

The view from Aquetong Road

The sanctuary roof top in the background.
The walls are pretty high and still going!

The front sanctuary doorway, and three sets of busy
(very warm!) workers doing the same thing.

The somewhat agonizing truth of building a
strong structure: One block at a time!!!
July 17
 
Blocks going up for the addition
 
Blocks going up for the addition

Newly laid floor beams of Fellowship Hall
July 15

Great progress is being made on the new addition
July 13

Blocks going up for addition (taken from old
breezeway between CE building and Sanctuary)

New addition (taken from cemetery)

Floor joists going in for new transom in Fellowship Hall
July 2

AC/heating ducts for addition and renovation

Building materials (bricks/lumber) for new addition

Latest view of the new parking lot
June 19

Fellowship Hall

Work being done to complete the overflow parking area

New interior wider hallway
June 10

Temporary ramp over the kitchen addition into the
existing kitchen area

Fellowship Hall addition; notice the cinderblock is about
up to existing floor level

Very front part of Fellowship Hall, showing basement windows
May 30
 
Concrete being poured for the Music/Youth addition

Around the edges of the elevator shaft

Working quickly to spread, smooth and level the concrete

Working quickly to spread, smooth and level the concrete

At the office entrance, five rows of cinder blocks outline
the outer extension wall of Fellowship Hall, as well as the
outer extension wall of the kitchen. First man on the
right is actually "in" the new kitchen area, with the older
existing kitchen area (including the door to the hallway)
evident in the background
May 28
 
The construction crew starting to lay the foundation for the Music/Youth Addition

Elevator shaft

Footings for the addition off the breezeway area
 
Footings for the addition off the breezeway area

Footings indicating where the extension wing of Fellowship Hall
will be to the left, chapel side

Right side of Fellowship Hall showing the extension wing as
well as the enlarged kitchen area
May 10

Preparation outside Fellowship Hall, the kitchen and office entrance earlier this past week.

Outside Sanctuary/music room
 
Pouring at Fellowship Hall/kitchen area on Thursday
May 3

Cinder blocks for Youth-Music addition

Digging the new kitchen foundation

Music-Youth addition