There's great progress!
May 28
 
The construction crew starting to lay the foundation for the Music/Youth Addition

Elevator shaft

Footings for the addition off the breezeway area
 
Footings for the addition off the breezeway area

Footings indicating where the extension wing of Fellowship Hall
will be to the left, chapel side

Right side of Fellowship Hall showing the extension wing as
well as the enlarged kitchen area
May 10

Preparation outside Fellowship Hall, the kitchen and office entrance earlier this past week.

Outside Sanctuary/music room
 
Pouring at Fellowship Hall/kitchen area on Thursday
May 3

Cinder blocks for Youth-Music addition

Digging the new kitchen foundation

Music-Youth addition
April 30
April 25
Friday afternoon in the kitchen
April 21

The left wall of Fellowship Hall removed
April 18
April 17
And the walls came tumbling down...

Elevator shaft as seen through classroom wall in basement.

Stripped wall outside breezeway.
April 14
April 2
 
A view of our "new" kitchen looking in from Fellowship Hall.

Fellowship Hall and the stage area

The breezeway from the sanctuary to the back of the CE building

The view from Fellowship Hall, through the old library
and into the Chapel

Fellowship Hall

The hallway tile wall was carefully removed by
Tim Sager and his crew
Preparation Photos
|