Construction News
 
There's great progress!

May 28


The construction crew starting to lay the foundation for the Music/Youth Addition

Elevator shaft

Footings for the addition off the breezeway area

Footings for the addition off the breezeway area

Footings indicating where the extension wing of Fellowship Hall
will be to the left, chapel side

Right side of Fellowship Hall showing the extension wing as
well as the enlarged kitchen area

May 10


Preparation outside Fellowship Hall, the kitchen
and office entrance earlier this past week.

Outside Sanctuary/music room

Pouring at Fellowship Hall/kitchen area on Thursday

May 3


Cinder blocks for Youth-Music addition

Digging the new kitchen foundation

Music-Youth addition

April 30

April 25

Friday afternoon in the kitchen

April 21

The left wall of Fellowship Hall removed

April 18

April 17

And the walls came tumbling down...


 

Elevator shaft as seen through classroom wall in basement.

Stripped wall outside breezeway.

April 14

April 2


A view of our "new" kitchen looking in from Fellowship Hall.

Fellowship Hall and the stage area

The breezeway from the sanctuary to the back of the CE building

The view from Fellowship Hall, through the old library
and into the Chapel

Fellowship Hall

The hallway tile wall was carefully removed by
Tim Sager and his crew
Preparation Photos