The contractors have started Phase 1 of the  renovation.  

Check out the changes to the youth room, classrooms, and hallways!

Design Concepts

These beautiful concepts are just that, concepts.
 

The end product may look different, but this is how our space could look. At this stage of the work, formal architectural designs are in process and subject to change based on fundraising and functionality.

Phase 1 Updates: Hallway Closure

As of June 2nd 2025, construction on our building has begun. The builders have started working on the lower level and classrooms. Therefore, the hallway starting at the chapel through the Choir Room is closed.

This phase of construction is projected to last from now until September.
As of today, June 2nd, the Sanctuary will now be accessible:

  • through the glass atrium doors from the Choir lot (labeled "atrium")
  • through the glass atrium doors from the courtyard (this entrance is handicap accessible, entrance labeled "fully accessible entrance")
  • through the red doors into the Sanctuary (labeled "red doors")

We will have a ramp set up inside the atrium for those who need it to access the Sanctuary. To reiterate, you will not be able to access the Sanctuary through the inside hallway; instead, you will have to walk around outside.